Monday, October 17, 2011

Production Schedule

Week One: Work on backgrounds. Find non-copyrighted picture of a ravine. Begin looking for an actor. Reserve black-box for shoot. Reserve camera equipment. Find footage of a train crash to rotoscope. Find footage of a swan dive.

Week Two: Film actor and begin rotoscoping the girl and train. Take pictures of the sky for the background.

Week Three: Finish rotoscoping.

Week Four: Composite the two images in After Effects. Add the backgrounds to the animation.

Week Five: Add sound-scape and music. Put the animation into the correct format.

No comments:

Post a Comment